WOOL FLANNEL · FRED TEXTILE

MOQ and Cost Questions for Wool Flannel

Compare quotations using the same reference, unit, width, colour allocation and confirmed commercial scope.

Your development decision

Compare quotations using the same reference, unit, width, colour allocation and confirmed commercial scope.

Distinguish quantity conditions

Minimum quantity may apply to a style, colour or other defined production basis. Ask exactly which condition governs the proposed reference. Do not turn a published per-style figure into a per-colour commitment.

Describe the development route

An existing reference, colour adjustment and new development can involve different arrangements. Identify the route in your enquiry. Sample and production feasibility should be discussed for the actual request rather than assumed from a collection image.

Compare the quotation unit

Price per metre, yard or kilogram requires a clear unit and specification. Record width, weight basis and currency as quoted. Two numbers are not comparable if their units or included scope differ.

Separate additional costs

Ask whether sample, colour trial, development, testing, packing and freight are included or listed separately. Record destination and relevant delivery terms from the actual quotation. Do not estimate them as confirmed charges.

Keep quantity and timing together

State total order expectation and colour breakdown, with sample and production dates as requests. Ask for the applicable quantity tiers and schedule. A target date remains open until a project agreement is made.

Give a useful budget target

Explain a target range and unit if available and rank the technical priorities. Ask Fred for a feasible proposal and confirmed quotation basis. Keep cost comparison alongside sample identity and garment requirements, rather than choosing by price alone.

A practical development example

Two quotations use different length units and include different sample or freight arrangements. Retain each original basis, confirm specification and convert only comparable units. Ask what is included before selecting the lower number. Keep total quantity and colour allocation visible for each proposal.

Working review record

Scroll the table horizontally on small screens.

Review point What to record Next decision
Per-style or per-colour quantity basis Record the actual value, conditions and source Keep this point open until reviewed
Price unit, width and currency Record the actual value, conditions and source Keep this point open until reviewed
Included sampling, testing and logistics Record the actual value, conditions and source Keep this point open until reviewed
Confirmed timing and quotation revision Record the actual value, conditions and source Keep this point open until reviewed

Before the next sample round

  • Per-style or per-colour quantity basis
  • Price unit, width and currency
  • Included sampling, testing and logistics
  • Confirmed timing and quotation revision
  • Record the reviewer, date and next action

Carry this decision into your project