Your development decision
Compare quotations using the same reference, unit, width, colour allocation and confirmed commercial scope.
Distinguish quantity conditions
Minimum quantity may apply to a style, colour or other defined production basis. Ask exactly which condition governs the proposed reference. Do not turn a published per-style figure into a per-colour commitment.
Describe the development route
An existing reference, colour adjustment and new development can involve different arrangements. Identify the route in your enquiry. Sample and production feasibility should be discussed for the actual request rather than assumed from a collection image.
Compare the quotation unit
Price per metre, yard or kilogram requires a clear unit and specification. Record width, weight basis and currency as quoted. Two numbers are not comparable if their units or included scope differ.
Separate additional costs
Ask whether sample, colour trial, development, testing, packing and freight are included or listed separately. Record destination and relevant delivery terms from the actual quotation. Do not estimate them as confirmed charges.
Keep quantity and timing together
State total order expectation and colour breakdown, with sample and production dates as requests. Ask for the applicable quantity tiers and schedule. A target date remains open until a project agreement is made.
Give a useful budget target
Explain a target range and unit if available and rank the technical priorities. Ask Fred for a feasible proposal and confirmed quotation basis. Keep cost comparison alongside sample identity and garment requirements, rather than choosing by price alone.
A practical development example
Two quotations use different length units and include different sample or freight arrangements. Retain each original basis, confirm specification and convert only comparable units. Ask what is included before selecting the lower number. Keep total quantity and colour allocation visible for each proposal.
How can a lower metre price become a higher garment cost?
A narrower usable width, directional cutting or a different pattern yield can consume more length per garment. Compare quotations on the same cloth specification, currency and delivery scope, then evaluate consumption with an actual cutting layout. Keep sampling, colour trials, tests and freight separate when they are not included. Ask whether minimum quantity applies per colour, per reference or to the whole order. Use confirmed project quotations rather than inventing a universal MOQ or price.
What if one colour is short of the mill minimum?
Suppose a buyer needs 180 m of navy and 120 m of charcoal. If the written offer requires at least 150 m per colour, ordering 300 m in total still leaves charcoal 30 m short. Ask whether the mill will supply 120 m for a small-run charge or requires delivery and payment for 150 m. These figures illustrate the calculation and do not describe a Fred Textile order condition.
Compare the two written offers on the quantity you will actually use. At an illustrative 12 per metre in the same currency, another 30 m costs 360 before any added freight. A fixed short-run charge of 240 would reduce cash outlay by 120 if all other terms match. If you can use the extra cloth for a confirmed reorder, show that separately. Confirm the delivered quantity, surcharge, shade lot and lead time for each colour before choosing.
Four lines to request on a fabric quotation
Scroll the table horizontally on small screens.
| Review point | What to record | Next decision |
|---|---|---|
| Order minimum | Ask for the article minimum and each colour minimum in the quoted unit. | Apply both conditions to your own colour split. |
| Price basis | Record price, currency, usable width and whether the length is in yards or metres. | Use the same unit and marker assumptions for both quotes. |
| Extra charges | Request separate figures for samples, colour work, testing and delivery where applicable. | Compare the total for the same delivery scope. |
| Validity | Record quote version, expiry and the proposed delivery window. | Reconfirm any expired price or provisional production slot. |
Before the next sample round
- Per-style or per-colour quantity basis
- Price unit, width and currency
- Included sampling, testing and logistics
- Confirmed timing and quotation revision
- Record the reviewer, date and next action